检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网浙江省电力公司电力科学研究院,杭州310014
出 处:《浙江电力》2015年第7期23-25,36,共4页Zhejiang Electric Power
摘 要:介绍了舟山±200 k V多端柔性直流输电工程换流站光TA(电流互感器)配置和应用情况。通过对换流站内不控充电启动试验的波形分析,找出了光TA电流异常原因,给出了整改方案。进行了一次注流试验验证并最终通过站系统的OLT试验和STATCOM试验验证了方案的正确性。指出在柔性直流输电工程中对于光TA的测试,除了传统的精度试验外,必须增加有针对性的一次注流试验。The paper introduces configuration and application of optical TA(current transformer) in converter station of Zhoushan ±200 kV multi-terminal flexible DC (direct current) transmission project. By waveform analysis of the non-controlled charging and startup test, the reason of abnormal TA current is detected and the rectification scheme is presented. A current injection test is conducted for verification, and the effective-ness of the scheme is verified by OLT (open line test) test and STATCOM (static synchronous compensator) test substation system. The paper indicates that t in addition to traditional precision test there must be an ad-ditional current injection test for optical TA test.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.224.69