沉管钢筋笼全断面整体置换法  被引量:5

Integral replacement technique for reinforcing cages full-section of immersed tube

在线阅读下载全文

作  者:董政[1] 黄文慧[1] 

机构地区:[1]中交四航局第二工程有限公司,广东广州510300

出  处:《中国港湾建设》2015年第7期92-95,共4页China Harbour Engineering

摘  要:港珠澳大桥沉管管节采用工厂法全断面整体浇筑工艺,要求钢筋笼也采用全断面整体绑扎成型方法。叙述了提高钢筋笼整体刚度、完成整体体系转换及内模安装等关键工序。施工工艺安全可控,施工质量有保证,可供大型钢筋流水线作业借鉴。The immersed tubes in the Hongkong-Zhuai-Macao Bridge project applied the factory full-section integral casting technology, and the reinforcing cages were required to use full-section integral binding method. We described the key procedures to improve the whole rigidity of reinforcing cages, complete the whole system transformation, and the installation of internal framework. The construction process is safe and controllable, the quality is guaranteed, it can be used to large reinforced assembly line work.

关 键 词:沉管 全断面 顶推 钢筋 置换 

分 类 号:U655.4[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象