检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石油大学提高采收率研究院,北京102249 [2]中国石油三次采油重点实验室,北京102249 [3]中国石油长庆油田第十采油厂,陕西庆阳745000 [4]中海石油(中国)有限公司天津分公司渤海石油研究院,天津300452 [5]中国石油大学石油工程教育部重点实验室,北京102249
出 处:《中国石油大学学报(自然科学版)》2015年第4期92-96,共5页Journal of China University of Petroleum(Edition of Natural Science)
基 金:国家自然科学基金项目(51374221)
摘 要:大庆喇嘛甸油田经过长期注水冲刷进入高含水期,并且存在注入水无效循环、水窜现象严重等问题,须采取调剖封堵增产措施。沥青颗粒主要是通过封堵高渗透水窜通道和扩大波及体积提高采收率,但现场应用过程中存在注入压力过高的问题,须通过室内试验研究沥青颗粒与地层配伍关系。根据相似准则和近井地带分流效应,研制带测压点的特殊胶结岩心,通过综合分析注入沥青颗粒及后续水驱过程中的阻力系数、残余阻力系数及封堵率,给出沥青颗粒粒径与油层的配伍关系,确定浓度对注入性的影响。结果表明:渗透率为2μm2的地层与粒径为(0.1~0.3)mm沥青颗粒配伍适宜,粒径过大或过小都会限制扩大波及体积作用;沥青颗粒浓度会限制其运移能力,当浓度增加到5 g/L时沥青颗粒会在地层局部大量堆积,高浓度沥青颗粒段塞注入过程可采用与水交替注入方式。The Lamadian block in Daqing Oilfield has been water flooded, and it is now at a high water cut stage with serious water channeling and ineffective water circulation. It is necessary to take channel blocking and conformance control meas- ures. Asphalt particles can be used to plug water channeling in high permeability zones in order to increase sweeping volume for improved oil recovery. In field applications, high injection pressure can be induced if the sizes of asphalt particles are not matched with formation pores in the reservoir. Experimental study was conducted using specially designed cement cores, based on similarity criteria to simulate the flow conditions in wellbore, to investigate the blocking effect of asphalt particles. The resistance coefficient, residual resistance factor and plugging rate were measured and analyzed to assess the matching between asphalt particles and the pores of the simulated cores, and the influence of particle concentration was also studied. The experimental results show that the cores with permeability 2 μm2 can be matched with the asphalt particle size of 0. 1-0. 3 mm. Undersized or oversized particles can reduce the conformance control effect, and the concentration of asphalt particles in the injectant can limit their migration ability. When the particle concentration is increased to 5 g/L, accumulations of asphalt particles can be caused in the formation, in which a scheme with asphalt particles alternative water injection is proposed to a- void the accumulation.
分 类 号:TE34[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.34