检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国石油长庆油田分公司第五采油厂,陕西西安710018
出 处:《石油化工应用》2015年第7期60-63,共4页Petrochemical Industry Application
摘 要:当注水开发油田进入中含水期时,精细注采调整工作将成为油藏稳产工作的重点。通过结合G9区现场实际,综合运用各种方法,对G9区长4+5油藏的合理流压、采液速度、合理注采比进行了研究,为该区下一步制定精细注采调整对策提供了理论依据。本次的研究成果对同类长4+5油藏稳产方案提供了一定的参考价值。Water entering in water flooding oilfields,fine adjusting injection work will become the focus of reservoir productivity.Through a combination of on-site using a variety of meth- ods,G9 the reasonable flow pressure,Chang 4+5 reservoir recovery rate,reasonable water in- jection rate and injection-production ratio is studied, injection-production adjustment mea- sures for further development in the area of fine provides a theoretical basis.Research out- comes for similar ence value. Chang 4+5 reservoir in this stability programme has provided some refer-
分 类 号:TE357.6[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15