检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团贵阳勘测设计研究院有限公司,贵州贵阳550081
出 处:《工程地球物理学报》2015年第4期508-513,共6页Chinese Journal of Engineering Geophysics
基 金:电力科技发展基金(编号:YJ2012-14)
摘 要:横断山区作为我国最大的水能基地,随着中国水电开发事业的发展和应对全球气侯变化、节能减排的需要,有必要加大该地区丰富的水电资源的开发,但横断山区的河流大部份处于深山峡谷中,受高边坡和恶劣气候的影响,河床两岸表层岩石风化剥蚀严重,表现出大面积的碎裂结构岩体分布,给水电站建设带来坝肩开挖工程量大或边坡失稳的影响。由于碎裂结构岩体与下覆基岩物性差异较小,探测难度较大。本文针对碎裂结构岩体的勘探问题,采用综合地震勘探方法进行分析研究,取得了良好的应用效果。Hengduan Mountain Region is the largest hydropower base of our country. With the development of China's bydropower and response to the global climate change, the need of energy conservation and emission reduction, it is necessary to intensify the development of this region which is rich in hydropower resources. Most of rivers in Hengduan Mountain Region are located in valley, influenced by high slope and bad weather. Surface rock of two riverbeds is seriously weathering in erosion, so there is a large area of cataclastic rock structure which causes huge excavation work or slope instability problems for hydropower station construction. Since the difference between the property of the cataclastic rock and that of under rock is small, it is hard to detect it. This paper uses comprehensive seismic method to analyze and obtain good application effects.
分 类 号:P631.4[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28