胶凝砂砾石坝防渗措施及应力分析  被引量:6

Analysis of stress and seepage control measures in the Cement sand gravel dam

在线阅读下载全文

作  者:张凤德 李秀文[2] 彭云枫[3] 王万顺[2] 

机构地区:[1]黑龙江省三江工程建设管理局,黑龙江哈尔滨150081 [2]中国水利水电科学研究院,北京100038 [3]三峡大学,湖北宜昌443002

出  处:《中国水利水电科学研究院学报》2015年第3期194-200,共7页Journal of China Institute of Water Resources and Hydropower Research

摘  要:由于胶凝砂砾石材料抗渗性能较差,采用其筑坝时需专门设计防渗措施进行坝体挡水。本文对胶凝砂砾石坝钢筋混凝土面板防渗措施,及新提出的高强度胶凝砂砾石面板和高强度胶凝砂砾石面板下铺设复合土工膜两种新型防渗措施进行渗流分析、考虑渗流作用的应力分析。计算结果表明:钢筋混凝土面板防渗效果较好,高强度胶凝砂砾石面板防渗效果较差;钢筋混凝土面板主应力最大、坝趾应力集中较为明显,高强度胶凝砂砾石面板和高强度胶凝砂砾石面板下铺设复合土工膜应力分布较为均匀。Due to the poor anti-seepage of the cement sand gravel materials, special seepage control mea- sures should be designed for the water retaining requirement of the dam. In this paper, both seepage and stress analysis under seepage condition were carried out for the cement sand gravel dam with seepage con- trol measures. Reinforced concrete panel and two novel measures: high strength cementations sand grav- el panel and high strength cementations sand gravel panel with laying composite geomembrane were consid- ered. Numerical results show that reinforced concrete panel perfoms well in seepage control while high strength cementations sand gravel concrete panel acts relatively poorly. The maximum principal stress ap- pears in the reinforced concrete panel and stress concentration at the dam toe is obvious. The stress distri- bution is more uniform in high strength cementations sand gravel panel and high strength cementations sand gravel panel with laying composite geomembrane.

关 键 词:胶凝砂砾石坝 防渗措施 渗流分析 应力分析 

分 类 号:TV31[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象