石浦水厂二期改扩建工程的设计与运行  被引量:2

Design and Operation of Second-phase Renovation and Expansion Project of Shipu Water Treatment Plant

在线阅读下载全文

作  者:周华[1] 李莹[1] 胡亮亮[1] 郑云斌 钟江丽[1] 项立新[1] 

机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州310014 [2]象山县石浦镇水务有限公司,浙江宁波315731

出  处:《中国给水排水》2015年第16期55-58,共4页China Water & Wastewater

摘  要:介绍了石浦水厂改扩建工程的特点和要求。改扩建工程实施后水厂处理规模从4.5×10~4m^3/d增加至9×10~4m^3/d,其中淡水处理规模为6×10~4m^3/d,苦咸水处理规模为3×10~4m^3/d。近期淡水和苦咸水出水勾兑均匀后供给用户,远期采用超滤、反渗透工艺对苦咸水进行深度处理。改扩建后水厂出水浊度从≤1.0 NTU提高至≤0.1 NTU,达到了浙江省现代化水厂的标准。The characteristics and requirements of the renovation and expansion project of Shipu Water Treatment Plant were introduced. After the implementation of the renovation and expansion project, the treatment capacity of the plant increases form 4.5 ×10^4m^3/d to 9×10^4m^3/d, which includes 6 ×10^4m^3/d for freshwater treatment and 3×10^4m^3/d for brackish water treatment. In the near future, the treated freshwater and brackish water are evenly blended and supplied to the users, in the distant future, the brackish water will be treated by UF and RO system. The turbidity of the treated water is improved from ≤1.0 NTU to ≤0.1 NTU, which meets the standards for modem water treatment plants in Zhejiang Province.

关 键 词:水厂 改扩建 苦咸水 超滤 反渗透 

分 类 号:TU991[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象