大亚湾核电站循环水泵维修策略优化分析  被引量:4

Maintenance Strategy Optimization Analysis for Circulating Water Pump in Daya Bay Nuclear Power Plant

在线阅读下载全文

作  者:张圣[1] 武涛 莫春铌 

机构地区:[1]苏州热工研究院有限公司,广东深圳518028 [2]中广核核电运营有限公司,广东深圳518124

出  处:《核动力工程》2015年第4期125-129,共5页Nuclear Power Engineering

摘  要:利用以可靠性为中心的维修(RCM)分析方法,优化大亚湾核电站循环水泵的维修策略,给出其全面解体检查周期。优化后的解体检查周期远远超过供货商建议的周期(8 a)和国内外同类设备的周期,可有效节约维修成本,并减少与维修活动相关的人因故障。This paper uses Reliability-centered Maintenance (RCM) method to optimize the maintenance strategy of circulating water pump in Daya Bay nuclear power plant. The overhaul cycle of circulating water pump is given in the paper, and the cycle is far more than the proposed cycle ( 8 years ) of vendor and the cycle of similar equipment at home and abroad, not only greatly reducing the maintenance costs, but also decreasing maintenance-induced failures, thus further improving the equipment reliability and availability.

关 键 词:循环水泵 维修策略 优化 可靠性为中心的维修(RCM) 解体检查周期 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象