检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430010 [2]武汉铁路职业技术学院,湖北武汉430205
出 处:《中国市政工程》2015年第4期4-5,共2页China Municipal Engineering
摘 要:凤凰山互通式立交属于开县省道S102渝巫路二期改造工程的控制性节点之一。根据项目功能、交通量预测、地形地质等控制性因素,拟定2个互通式立交方案。在充分考虑交通适应性、工程规模、分期建设等因素的前提下进行全面的方案比选,最终确定推荐方案,为类似山区的立交工程设计提供参考。The Phoenix Mountain interchange is one of the controlling points of the second-stage improvement project of Yuwu Rd., provincial road S102, in Kaixian. According to the controlling factors such as project function, predicted traffic volume, terrain & geology, two interchange schemes are studied in this paper. Based on the traffic flexibility, engineering scale and phased construction, the two interchange schemes are compared completely, and then the recommended scheme is put forward, which may provide references for similar interchange design in mountain areas.
分 类 号:U412.352.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145