检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗振华
出 处:《广东公路交通》2015年第4期63-65,69,共4页Guangdong Highway Communications
摘 要:地铁隧道施工必将穿越大量既有桥梁,并对其正常使用造成不利影响,桩基的变形是隧道下穿既有桥梁施工影响的控制核心。以莞惠城际铁路隧道下穿惠州市鹅桥施工为工程背景,通过现场实测数据分析隧道下穿既有桥梁的影响。Construction of subway tunnel will inevitably pass through a large number of existing bridges and make adverse impact to their normal use, among which the deformation of pile foundation is the control core during the subway tunnel construction passing through the existing bridges. Taking Guanhui Intercity Subway Tunnel passing through E Bridge in Huizhou City as an engineering background, on the basis of field testing data, the influence of subway tunnel passing through the existing bridges has been studied and analyzed.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200