隧道下穿既有桥梁施工量测与变形控制  被引量:5

Research on Field Test and Deformation Control for Subway Tunnel Passing through Existing Bridges

在线阅读下载全文

作  者:罗振华 

机构地区:[1]广州环达路桥科技有限公司,广州510520

出  处:《广东公路交通》2015年第4期63-65,69,共4页Guangdong Highway Communications

摘  要:地铁隧道施工必将穿越大量既有桥梁,并对其正常使用造成不利影响,桩基的变形是隧道下穿既有桥梁施工影响的控制核心。以莞惠城际铁路隧道下穿惠州市鹅桥施工为工程背景,通过现场实测数据分析隧道下穿既有桥梁的影响。Construction of subway tunnel will inevitably pass through a large number of existing bridges and make adverse impact to their normal use, among which the deformation of pile foundation is the control core during the subway tunnel construction passing through the existing bridges. Taking Guanhui Intercity Subway Tunnel passing through E Bridge in Huizhou City as an engineering background, on the basis of field testing data, the influence of subway tunnel passing through the existing bridges has been studied and analyzed.

关 键 词:地下隧道 桥梁桩基础 连续梁桥 变形控制 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象