检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《煤矿安全》2015年第8期135-137,共3页Safety in Coal Mines
摘 要:为控制受动压影响的掘进巷道围岩变形及锚杆破断情况,分析巷道的破坏形式为典型的留煤柱沿空掘巷巷道破坏现象。经计算,选取耦合让压应力显示锚杆,规格为20 mm×2 500mm;顶锚杆排间距1 000 mm×920 mm;帮锚杆排间距1 000 mm×1 000 mm,采用新支护技术后,顶板与两帮最大移近量分别为50、90 mm,巷道围岩变形得到有效控制。To control the deformation of surrounding rock and the bolt fracture phenomenon of the dynamical pressure heading roadway,the study analyzes that the damage form of roadway is a typical destruction of the remaining coal pillar gob- side entry driving. According to the theoretical calculation,the coal mine selects coupling release- pressure anchor. The specifications for the anchor is 20 mm× 2 500 mm; the roof bolt spacing is 1 000 mm × 920 mm; the end anchor bolt spacing is 1 000 mm × 1 000 mm; after adopting new supporting system,the biggest roof and end anchor rock deformation is 50 mm and 90 mm. The deformation rock of roadway receives effectively control.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117