水电站水库分期调度图研究  被引量:9

Study on staged reservoir operation chart of hydropower station

在线阅读下载全文

作  者:解阳阳 黄强[1] 张节潭[2] 王义民[1] 刘赛艳 

机构地区:[1]西安理工大学水利水电学院,西安710048 [2]国网青海省电力公司,西宁810000

出  处:《水力发电学报》2015年第8期52-61,共10页Journal of Hydroelectric Engineering

基  金:国家重大基础研究973(2011CB403302-2);教育部博导基金(20116118110009)

摘  要:为提高水电站水库发电效益,本文初步提出了一种适应水电站水库不同时期出力特点的分期调度图。首先,阐述水电站分期调度图的基本原理和绘制方法;其次,确定流域水文年起止时间,划分流域丰水期和枯水期;再次,建立梯级水电站发电量最大模型;最后,以大通河梯级水电站调度为例验证分期调度图的合理性。应用表明:分期调度优于常规调度图,可为水电站水库调度提供一条新思路。To increase power output of hydropower plants, a staged operation chart is presented in this paper to better represent the output capabilities in different seasons. We elaborate a basic principle and drawing method of the staged chart, and determine the hydrologic year, high-flow season, and low-flow season of the study catchment. Then, an optimal operation model is developed to maximize the total power output of the cascaded hydropower plants. Finally, we test this chart method via a case study of the cascaded plants on the Datong River. Results show that the staged operation chart is better than the routine operation chart and could provide a new way for the operation of hydropower plants.

关 键 词:水文年 水电站 优化模型 分期调度图 常规调度图 

分 类 号:TV697[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象