检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京矿冶研究总院,北京100160
出 处:《矿冶》2015年第4期1-4,共4页Mining And Metallurgy
基 金:"十二五"国家科技支撑计划课项目(2012BAB01B01)
摘 要:采用数值模拟计算的方法分析了某矿山-290 m水平矿柱在开采扰动过程中的力学效应显现规律。研究结果表明,上部中段采场胶结充填及硐室开挖后,应力向水平矿柱转移;下部中段开采后,水平矿柱整体处于高度应力集中状态,大部分区域都能从开采过程中的拉剪破坏恢复到弹性工作状态。综合分析结果表明,水平矿柱在开采扰动过程中整体稳定性良好。The stability of the - 290 m level isolation pillar during the process of mining is analyzed by the method of numerical simulation. The results show that after the stope is cement-filled and the upper chamber exca- vated, the stress transfers to the isolated pillar; After the mining of lower stopes, the isolated pillar is in a state of high stress concentration, most of the region of the pillar will recover from a tensile shear failure state to the elastic state in the process of mining. Comprehensive analysis shows that the horizontal pillar is stable in the process of mining disturbance.
分 类 号:TD853.322[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15