PHC桩穿越深厚硬黏性土成桩可行性及现场试验研究  被引量:4

Piling feasibility analysis and field test study on PHC pile driven through thick and deep stiff clayey soil

在线阅读下载全文

作  者:孙亚哲[1] 胡钧[1] 潘永伦 黄文君[1] 柳春[1] 

机构地区:[1]中国电力工程顾问集团华东电力设计院有限公司,上海200063

出  处:《工程勘察》2015年第9期20-27,共8页Geotechnical Investigation & Surveying

摘  要:通过GRLWEAP软件对穿越深厚硬黏性土层工况的PHC桩进行成桩可行性分析,同时在工程现场开展高应变打桩监测试验。研究发现在硬黏性土地基条件下,PHC桩施打过程中因土塞效应产生的环向张力是造成桩身损伤的主要因素,在桩尖上加焊内环,并采取加水润滑等方法对保证桩身的完整性有很大的帮助。PHC pile driven through deep and stiff clayey soil is analyzed by software GRLWEAP. High strain dynamic test is also carried out to monitor the piling process. The study finds that the radial tension caused by the plug effect is the main factor to damage the pile shaft when piling through stiff clayey soil. The pile shaft integrity could be guaranteed by welding an inner ring on the pile tip, and lubricating by means of adding water.

关 键 词:PHC桩 深厚硬黏性土层 GRLWEAP 高应变动力检测 土塞 内环 

分 类 号:TU473[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象