七改煤柱工作面大坡度仰采与煤壁片帮治理技术研究  被引量:2

Study on Qigai Coal Pillar Working Face Big Gradient Overhead Mining and Coal Wall Rib Spalling Control Technology

在线阅读下载全文

作  者:姜永平 

机构地区:[1]冀中能源峰峰集团大社矿,河北邯郸056201

出  处:《煤炭与化工》2015年第8期67-68,71,共3页Coal and Chemical Industry

摘  要:七改煤柱工作面地质条件复杂,在回采过程中工作面需要仰采260 m,仰采角度平均30°,最大36°。在仰采过程中工作面需最难控制的是工作面顶板管理、支架溜子拉移困难、煤机割煤装煤困难、煤壁片帮困难。针对这些问题,工程技术人员展开技术攻关,总结了综放工作面仰采和煤壁片帮治理技术,为今后类似的工作面增补了实践经验。Qigai coal pillar working face faces complicated geological conditions, overhand mining with 260 m is needed in the recovery, average overhead mining angle is 30° , maximum 36° . Working face roof management, difficulty of support movement, mining machine cutting and loading, coal wall rib spalling were the most difficult control. Based on this problem, engineering and technical staff developed technological breakthrough, overhead mining and coal wall rib spalling full-mechanized caving mining face control technology was summarized, which effectively solved overhead mining working face technology problem and provided practice and experience for similar working face.

关 键 词:煤柱工作面 仰采 玻璃钢管 

分 类 号:TD323[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象