检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩国峰
机构地区:[1]达智咨询顾问(深圳)有限公司,广东深圳518026
出 处:《现代建筑电气》2015年第8期60-64,共5页Modern Architecture Electric
摘 要:根据民用建筑用电规划负荷指标,以及各地区地方政府供电部门用电要求,计算了住宅建筑群总规划用电量,设计了10 k V高压供电系统主接线方案,布置10 k V开关站位置。同时结合住宅建筑群建筑规划建设用地性质、开发顺序调整,以及已经确定的部分地块施工图中变压器安装容量,调整总规划用电量,修改10 k V高压供电系统图,可供大型住宅建筑群总规划用电设计作为参考。According to the power planning load index of residential buildings and utilization requirements of regional power supply department, this paper calculated the general power planning for large residential buildings and design main connection project of 10 kV high voltage supply system which set up the situation of main switch. Combing by the land usage, adjusting development subsequence, and installed capacity of transformer in the certain part construction drawings, the general power planning for large residential buildings was adjusted and the construction drawing of 10 kV high voltage supply system was modified. It can provide references for the similar large residential buildings.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222