检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨忠东[1]
机构地区:[1]开滦(集团)有限责任公司,河北省唐山市063000
出 处:《中国煤炭》2015年第8期63-66,共4页China Coal
摘 要:研究了唐山矿业公司铁一区5#煤层大倾角工作面托复合顶板开采技术,通过分析大倾角工作面托复合顶板开采的冒顶机理,对煤层倾角、地质变化和生产管理等影响因素进行了分析,总结出了一套系统处理冒顶事故的方案,加强工作面质量管理、打超前锚杆加固煤壁、注射煤体固化剂、优化采区设计等处理措施,实现了大倾角工作面托复合顶板的安全开采。In this paper,the author researched the techniques of mining with supporting complex roof in large dip angle face of 5#coal seam in Tieyi area in Tangshan Mining Company.Through the analysis of roof fall mechanisms during mining with supporting complex roof in large dip angel face,combined with the analysis of coal seam dip angle,geological changes and production management,a scheme of systematic roof fall accident treatment was summarized,and some treatment measures were put forward,such as strengthening working face quality management,using advance anchor bolts to reinforce coal wall,injecting coal curing agent,optimizing mining area design and so on,which achieved the safe and successful mining with supporting complex roof in large dip angle face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.162.188