无底柱分段崩落法崩矿步距优化方法及应用  被引量:18

Optimization and Application on Caving Space of Non-pillar Sublevel Caving Method

在线阅读下载全文

作  者:何荣兴[1] 任凤玉[1] 宋德林[1] 马娇阳[1] 

机构地区:[1]东北大学资源与土木工程学院,辽宁沈阳110819

出  处:《矿业研究与开发》2015年第8期1-4,共4页Mining Research and Development

基  金:中央高校基本科研业务费专项资金资助项目(N130301002)

摘  要:无底柱分段崩落法崩矿步距的影响因素很多,一直以来没有得出较好的优化方法。根据随机介质放矿理论的研究成果,对北洺河铁矿2种崩矿步距出矿时的废石混入情况进行了跟班标定,结果表明:1.7m崩矿步距时,废石从正面流出;3.4m崩矿步距时,废石先从顶部出露,说明崩矿步距合理值位于两者之间。针对1.7,2,2.2m三种步距进行了工业试验,结果为2.2m崩矿步距时,矿石回收效果最好,在北洺河铁矿现有爆破参数条件下,推荐崩矿步距值为2.2m。Due to factors influencing on caving space of nonpillar sublevel caving method,a desired optimization method has not been concluded.According to the researching results of stochastic medium theory of drawing,the mixing waste rocks during the ore drawing were studied under two caving spaces in Beiminghe iron mine.The results showed that when the caving space was 1.7 m,the waste rocks mixed from the obverse side;when the caving space was 3.4 m,the waste rocks were exposed from the top of drawing point.Therefore,the reasonable caving space was between 1.7 m and 3.4m.The industrial tests were put forward under the caving spaces of 1.7 m,2 mand 2.2 m,and the optimum ore recovery rate was obtained when the caving space was 2.2m.In concluded,under the condition of existing blasting parameters,the caving space of 2.2m was recommended.

关 键 词:无底柱分段崩落法 崩矿步距 随机介质放矿理论 

分 类 号:TD853.362[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象