机构地区:[1]广西中金岭南矿业有限责任公司,广西来宾市545900 [2]长沙矿山研究院有限责任公司,湖南长沙410012 [3]金属矿山安全技术国家重点实验室,湖南长沙410012
出 处:《矿业研究与开发》2015年第8期19-22,共4页Mining Research and Development
摘 要:针对盘龙铅锌矿前期地下开采过程中遗留的空区与矿柱问题,确定采用尾砂胶结充填处理采空区,同时根据矿柱的具体情况分别选用点柱式上向水平分层充填采矿法、上向水平分层进路充填采矿法、上向水平分层充填采矿法进行回采,三种方案的采场生产能力为70-100t/d,采矿损失率为10%-15%,贫化率为7.5%-10.5%。结果表明:矿山采用的充填采矿方案是适用的,且应用效果良好。There were some problems caused by the left goafs and pillars during the previous mining in Panlong lead-zinc deposit.To solve these problems,cemented filling with tailing was applied to deal with goafs.Meanwhile,according to the detailed conditions,pillars were respectively mined by point-pillar upward horizontal cut and fill stoping method,upward horizontal sliced drift cut and fill mining method and upward horizontal cut and fill stoping method.The production capacity of the stope under these three methods was among 70-100t/d,the loss rate was among 10% -15%,and the dilution rate was 7.5%-10.5%.The results indicated that filling mining method was feasible to this mine,with preferable application.
分 类 号:TD853.391[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117