检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国葛洲坝集团股份有限公司勘测设计院,武汉430223
出 处:《水科学与工程技术》2015年第4期45-47,共3页Water Sciences and Engineering Technology
摘 要:水电站投产运行后,尾水位由于各方面原因变动,对水电站运行也将造成一定影响,以新疆塔吉克二级水电站为例,尾水渠末端设置有坎宽顶堰,由最低尾水位计算堰顶高程,并由设计的有坎宽顶堰及最大设计流量计算最高尾水位。从而使水电站尾水不因下游渠道冲刷而变化。after hydropower station put into operation, the tail water level changed due to various aspects reason, and caused an influence on hydropower station operation. Taking Xinjiang Tajik secondary hydropower station as an example,the end of the tailrace set broad crested weir, this paper calculates weir crest elevation by the lowest levels, and calculates the highest tail water level by the broad crested weir and maximum design flow, so that the hydropower station tail water will not change due to downstream channel scour.
分 类 号:TV131[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117