引水式电站尾水渠设计探讨  被引量:1

Exploring design of tailrace of water diversion type hydropower station

在线阅读下载全文

作  者:吴世元 赵峰 

机构地区:[1]中国葛洲坝集团股份有限公司勘测设计院,武汉430223

出  处:《水科学与工程技术》2015年第4期45-47,共3页Water Sciences and Engineering Technology

摘  要:水电站投产运行后,尾水位由于各方面原因变动,对水电站运行也将造成一定影响,以新疆塔吉克二级水电站为例,尾水渠末端设置有坎宽顶堰,由最低尾水位计算堰顶高程,并由设计的有坎宽顶堰及最大设计流量计算最高尾水位。从而使水电站尾水不因下游渠道冲刷而变化。after hydropower station put into operation, the tail water level changed due to various aspects reason, and caused an influence on hydropower station operation. Taking Xinjiang Tajik secondary hydropower station as an example,the end of the tailrace set broad crested weir, this paper calculates weir crest elevation by the lowest levels, and calculates the highest tail water level by the broad crested weir and maximum design flow, so that the hydropower station tail water will not change due to downstream channel scour.

关 键 词:引水式电站 尾水渠 特征水位 有坎宽顶堰 

分 类 号:TV131[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象