检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨菊香[1]
机构地区:[1]山西省水利水电勘测设计研究院,山西太原030024
出 处:《山西水利科技》2015年第3期90-92,95,共4页Shanxi Hydrotechnics
摘 要:流域上游具有一定调蓄能力的水库建成后,将对下游工程的设计洪水产生较大影响。文中对沁河流域杜河水电站天然设计洪水和受张峰水库影响后的设计洪水分别进行了计算,并定量分析了上游张峰水库对杜河水电站洪水的削减作用及削减洪峰的程度,通过分析比较后最终确定了杜河水电站设计洪水成果。After the completion of the upstream reservoir in the basin with a certain flood regulating capacity, its regulation effect will greatly have influence on the design floods of the downsream project. In the paper the natural design floods for the Duhe Hydropower Station in the Qinhe basin and the design floods under the impact of the Zhangfeng reservoir is separately calculated; the effect of the Zhangfeng reservoir in the upstream on the design floods and the degree of the flood peak clipping for the Duhe Hydropower Station is quantitatively analyzed, and ultimately the results of the design floods are determined.
分 类 号:TV122[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222