检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋海涛[1]
机构地区:[1]包头供电局,内蒙古包头014030
出 处:《内蒙古电力技术》2015年第4期90-93,共4页Inner Mongolia Electric Power
摘 要:针对在实际工作过程中发生的变电站内2组直流电源同时接地现象,根据直流绝缘监察装置电路原理,利用其等效电路模型对该接地现象进行了定性分析,指出产生这种接地现象的原因是由于工作人员将2组直流电源混淆导致直流系统产生了寄生回路。鉴于2组直流电源同时接地可能导致的保护误动、拒动等后果,提出应严格遵守《国家电网公司十八项电网重大反事故措施》和其他相关规定、规范变电站二次系统施工工艺、加强隐患排查等防范措施。For two DC supply simultaneous grounding appeared in the actual workprocess,according to the principle of DC insulation monitoring device,made qualitativeanalysis of the grounding by the equivalent circuit model,and pointed out that thesimultaneous grounding was due to the generation of substation parasitic circuit since thetwo DC supply were confused.To protection malfunction,tripping and other consequencescaused by two DC supply simultaneous grounding,finally,put forward to observe State Power Grid Corporation of eighteen major anti- accident measures strictly and the relevantprovisions,regulate the construction process of secondary system in substation,andstrengthen potential accident checking to prevent the accident from happening.
关 键 词:变电站 直流电源接地 寄生回路 电桥平衡 直流绝缘监察装置 电路模型 保护拒动
分 类 号:TM645.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.198.25