浅议地下洞室地质缺陷超挖的管理及认定——以乌东德地下电站为例  被引量:3

Management and Identification of Over-excavation due to Geological Defects in Underground Chamber Construction in Wudongde Hydropower Station

在线阅读下载全文

作  者:简崇林[1] 付继林[1] 唐道初[1] 

机构地区:[1]中国长江三峡集团公司,北京100038

出  处:《水电与新能源》2015年第8期44-47,共4页Hydropower and New Energy

摘  要:通过梳理乌东德地下电站洞室地质缺陷的管理及认定工作中存在的问题,提出了相关改进措施,明确地质缺陷超挖界定标准、认定管理办法及程序,探讨了洞室开挖中关于超挖经济问题处理的合同条文,总结了地质缺陷超挖管理及认定的相关经验。Problems in the management and identification of geological defects in the underground chamber construction in Wudongde Hydropower Station are summarized. Improvement measures are then proposed to clear the definition of o- ver- excavation due to geological defects, and the management and identification procedures. Contract terms for eco- nomic issue management related to the over-excavation are discussed. Experience on the management and identification of over-excavation due to geological defects is summarized.

关 键 词:地下洞室 地质缺陷超挖 界定 认定 

分 类 号:TV554[水利工程—水利水电工程] U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象