检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]大同煤矿集团同达热电有限公司,山西大同037001
出 处:《发电设备》2015年第5期356-359,共4页Power Equipment
摘 要:结合某330 MW级循环流化床锅炉冷态点火至连续投煤过程,分析了影响启动时间和启动油耗的因素,并作出优化调整。结果表明:优化后初始床温提高了41K,启动耗时缩短了84min,启动油耗降低了6.4t,效果显著。For the course of a 330 MW CFB boiler from cold start ignition to continuous coal input, factors influencing the start-up time and the oil consumption were analyzed, to which optimization adjustment was made. Results show that after optimization, the initial bed temperature is increased by 41 K, the start-up time is reduced by 84 minutes and the oil consumption is decreased by 6.4 t, indicating remarkable optimization effects.
分 类 号:TK229.66[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33