机构地区:[1]贵州省水利投资有限责任公司,贵州贵阳550002
出 处:《东北水利水电》2015年第9期11-13,共3页Water Resources & Hydropower of Northeast China
摘 要:大中型水库高危边坡通常采用预应力锚索加固,为了给造孔机械、编索、下设、注浆等提供施工条件,多采用脚手架管搭设平台。在乌江索风营水电站Dr2危岩体施工中,首次采用型钢栈桥,不仅克服了边坡较高、岩壁陡峭、局部倒挂等施工难题,还保证了平台稳定,节约了大量材料,技术经济效果明显。The reinforcement of high and dangerous slope of large and middle reservoir usually use the prestress anchorage cable. In order to provide the construction conditions for making hole, weaving chain, down laying and grouting, the scaffold pipes are often used to make platform. The steel reinforced trestle bridge is firstly used in construction for Dr2 dangerous rock of Suofengying hydropower station in Wujiang river. The project not only overcomes the problems of higher slope, steep cliffs, local hanging upside down, etc., but also ensures the platform stability and saves lots of materials. The technical and economic effect is obvious.
关 键 词:锚索栈桥 设计与施工 Dr2危岩体 乌江索风营水电站
分 类 号:TV223.24[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222