叠合板式混凝土剪力墙结构工程施工问题及对策研究  被引量:9

Problems and Countermeasures of Composite Slab Concrete Shear Wall Structure Construction

在线阅读下载全文

作  者:陈力 金星 王荣标 章梦杰 

机构地区:[1]绍兴宝业西伟德混凝土预制件有限公司,浙江绍兴312030 [2]浙江宝业住宅产业化有限公司,浙江绍兴312030

出  处:《施工技术》2015年第16期57-59,共3页Construction Technology

摘  要:以宝业·万华城项目23号楼标准户型的施工为研究对象,对施工过程中存在的问题进行梳理,提出相应的措施,整个项目施工的应用结果表明这些措施是行之有效的。装配式建筑施工不同于传统全现浇建筑施工,在设计阶段应充分考虑施工时各工序对预制构件的影响,管理人员及作业人员宜全面掌握相关的专项施工技术,避免因操作不到位而导致的安装误差。Taking Baoye·Wanhuacheng No. 23 standard apartment as the research object,problems existing in the real process of construction are analyzed,the corresponding countermeasures are put forward,and the results of application of the whole project show that these measures are effective. Precast construction is different from traditional cast-in-place construction. In design stage,the influence of the construction process on the prefabricated components should be fully considered. Managers and operating personnel ought to master the specific construction technology involved,in order to avoid the mistakes caused by the inappropriate operation of the installation.

关 键 词:预制装配式 叠合板式混凝土剪力墙结构 预制构件 施工技术 

分 类 号:TU756[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象