检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王昀睿[1]
出 处:《现代制造工程》2015年第9期38-41,共4页Modern Manufacturing Engineering
摘 要:电动机装配包括定子和转子的组装及整体装配,通过对某微型电动机生产现场的调研,应用5W1H、ECRS及设施规划等工业工程(Industrial Engineering,IE)方法,对微型电动机装配的工艺流程、及其所在车间的布局等方面进行分析改善。改善后减少加工和运输各两次;取消了不必要的等待;通过改善相关工位的顺序和布置,搬运距离明显减小,搬运路线不再交叉;同时运用时间测定的方法确定了各加工单元的标准作业时间,按照均衡工序节拍的原则调整工序作业内容,对装配线进行了平衡改善,最终使生产节拍由5min变成2.97min,生产线平衡率由63.6%提高到94.1%,给企业带来了明显的经济效益。Motor assembly includes the stator and rotor assembly, through the research of manufacturing, process flow and work- shop layout was analyzed and improved using Industrial Engineering(IE) methods of 5W1 H, ECRS, facilities planning and so on, which reduced processing and transportation 2 times each, cancelled unnecessary waiting, by improving the order of relevant sta- tion and arrange, moving distance was saved significantly, moving routes no longer cross; at the same time using time measurement method to determine standard work time of each processing unit, adjusted work content according to the beat, eventually made pro- duction type decreased from 5min to 2.97min, line balancing rate increased from 63.6% to 94.1% , brought obvious economic benefit to the enterprise.
分 类 号:TH16[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15