上向进路充填采矿法最佳充填接顶率研究  被引量:5

Research on the Optimal Roof-contacted Filling Ratio of Upward Drift Stoping with Backfill

在线阅读下载全文

作  者:刘发平[1] 陈宪龙[1] 

机构地区:[1]马钢(集团)公司姑山矿业有限责任公司

出  处:《现代矿业》2015年第8期23-25,共3页Modern Mining

摘  要:为解决白象山铁矿在上向进路充填采矿过程中充填接顶效果不理想的问题,对该矿山的充填接顶率进行了研究。运用MIDAS/GTS有限元软件模拟分析二步进路采场开采时,一步进路采场不同充填接顶率胶结矿柱受力状况,并对胶结矿柱安全稳定性进行评价,对不同充填接顶率进行分析,从而确定最佳充填接顶率。当二步进路采场开采时,一步进路采场80%充填接顶率胶结矿柱抗拉安全系数为2.03,抗压安全系数为1.28,综合安全系数为1.6,为该矿上向进路充填法的最佳充填接顶率。该研究为其他矿山科学提高充填接顶率提供了一种全新的指导方向。In the process of upward drift stoping with backfill in Baixiangshan iron mine,the roof-contacted effect is not perfect,the roof-contacted filling ratio of the mine is researched.The MIDAS /GTS finite element software is applied to analyze the stress condition of the first-step approach stope cemented pillars that have different roof-contacted filling ratio when the second-step approach stope are conducted. Besides that,the security and stability of the cemented pillars are evaluated,and the different roof-con-tacted filling ratios are analyzed in depth so as to determine the optimal roof-contacted filling ratio.when the second-step approach stope are conducted,the tensile safety coefficient of the first-step approach stope cemented pillars with 80%roof-contacted filling ratio is 2.03,the compressive strength factor of safety is 1.28,the synthesized safety coefficient is 1.60.The above research results can provide a brand-new di-rection for the other mines to improve the roof-contacted filling ratio scientifically.

关 键 词:充填 最优充填接顶率 有限元分析 综合安全系数 

分 类 号:TD861.1[矿业工程—金属矿开采] TD853.34[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象