电厂机组降压运行后消纳能力分析  被引量:3

Analysis on assimilative capacity of Power Plant unit in operation with lower voltage level

在线阅读下载全文

作  者:罗纯坚[1] 潘力强[2] 费烨[3] 熊炜[1] 

机构地区:[1]国网湖北省电力公司电力经济技术研究院,湖北武汉430077 [2]国网湖南省电力公司,湖南长沙410007 [3]中国电力科学研究院,湖北武汉430074

出  处:《湖南电力》2014年第2期36-37,46,共3页Hunan Electric Power

摘  要:从潮流、暂态稳定、短路电流等方面,对湘潭电厂3号机组由500 kV电网改接至220 kV电网后,对主网及长株潭受端电网的影响进行系统分析。研究表明,这样改接可减轻云田主变下网压力,改善受端电网的潮流分布,同时系统的电压稳定水平较高,短路电流可维持在合理水平,技术上具有可行性。The impact on the main network and the receiving end power grid of Changsha Zhuzhou Xiangtan area were systematically discussed in the paper,on the power flow,transient stability,short circuit current,after Xiangtan Power Plant 3rdunit has been grafted to 220 kV power network. The research result shows that after being reconnected,the heavy power flow of the Yuntian substation will be released,power flow distribution of receiving end power grid can be improved,and the stability and the short circuit current can be controlled in an reasonable range.

关 键 词:潮流 稳定 短路电流 消纳能力 

分 类 号:TM744[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象