检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,武汉430072
出 处:《中国水利》2015年第18期31-33,64,共4页China Water Resources
摘 要:非法采砂引发的河道水位下降问题,不仅降低河岸引水建筑物的引水效率,还使得上下游水位差增大,对拦河闸坝安全运行造成不利影响。以橡胶坝工程为例分析下游不同水位下降对工程的防渗、消能防冲和稳定的影响,得出下游水位下降越多对工程安全越不利,并且消能工的各个组成部分之间的破坏关系是相互影响的结论,并提出要重视闸坝工程建后管理和河道采砂的不利影响,以确保工程安全运行的建议。Illegal sand excavation may induce lowering of water level in river courses, and exert negative impact on safe operation of sluice and dam, as it not only reduces efficiency of water diversion works on the river bank but also increases the waterhead upstream and downstream. Analysis on impact of increase waterhead upstream and downstream on seepage control and energy dissipation and erosion control are undertaken with an example of rubble dam. It concludes that lowering of water level downstream may cause harm to the safety of water structures and the damage of each component are interacted. It is proposed to pay more attention on control of sluice and dam and negative impact of sand excavation, so as to ensure safe operation of water structures.
关 键 词:河道采砂 水位下降 引水工程 闸坝安全 工程管理
分 类 号:TV85[水利工程—水利水电工程] TV644
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.118.32.116