机构地区:[1]中铁隧道集团二处有限公司,河北三河065201
出 处:《隧道建设》2015年第9期949-956,共8页Tunnel Construction
摘 要:结合南昌红谷沉管隧道干坞坞底施工,对干坞坞底处理重难点进行分析,通过采取坞底合理优化分区促成管段预制流水化施工、基底软层分区换填、预制基座格梗枕梁采用角钢超平、起浮层采用"混凝土+滤水导流槽"、合理优化排水系统等技术措施,顺利完成干坞坞底施工,满足了管段荷载、快速预制和起浮等各方面要求。The difficulties in the construction of the bottom of the dry dock of Honggu tunnel in Nanchang are presented. Countermeasures, including proper zone division of the dry dock bottom, zonal replacement filling, adopting angle steel for the sleeper beam, floating layers consisting of concrete and filtering channels and proper optimization of the drainage system, are adopted. In the end, the construction of the bottom of the dry dock has been completed successfully and relevant requirements have been complied with.
关 键 词:沉管隧道 干坞 坞底 分区 换填 起浮层 滤水槽
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.183