100MW母管制机组定参数启动操作优化方案  被引量:1

The Optimization Scheme of 100MW Main-pipeline Unit Constant Parameters Operation

在线阅读下载全文

作  者:白逢 

机构地区:[1]神华煤制油化工有限公司鄂尔多斯煤制油分公司,内蒙古鄂尔多斯017209

出  处:《神华科技》2015年第5期56-59,共4页Shenhua Science and Technology

摘  要:神华煤制油化工有限公司鄂尔多斯煤制油分公司热电生产中心(以下简称热电生产中心)2×100MW汽轮机(NZK100-9.32/535)分别于2007年9月和2008年1投产,机组在历次启动过程中,上下缸温差经常出现超标现象,最大温差达120℃;高压缸和低压缸胀差经常逼近保护动作值,给机组的安全运行带来极大风险。本文针对上述异常现象进行分析,并提出优化方案。Shenhua Cola Chemical Industry Co., Ltd, thermoelectricity generation Center of Branch of Ordos Coal Oil Company (Short name: thermoelectricity generation Center) 2×100MW steam turbine (NZK100-9.32/ 535) puts into introduction in September 2007 and January 2008, the temperature difference between upper and lower casings is overproof during the start every time, the biggest difference in temperature up to 120℃ High and low pressure cylinder eapansion close to protection operation, which bring great venture to safe operation of the unit. The article analyses and puts forward scheme on above phenomenons.

关 键 词:定参数 启动 上下缸温差 胀差 

分 类 号:TM31[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象