检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021 [2]重庆云能发电有限公司,四川重庆450000
出 处:《东北水利水电》2015年第10期6-7,71,共2页Water Resources & Hydropower of Northeast China
摘 要:文章叙述了引水洞附近边坡地下水位壅高变化,是由于内水外渗抬高,因地下水渗流速度较慢。以流线表示地下水渗流曲线,采用分段法及其修正,计算其单宽流量及渗出高度,再选取滑动面采用传递系数法进行单宽稳定计算,进而评价其稳定性。The paper describes thechanges ofgroundwaterbackwater height of the slope near the water diversion tunnel. This groundwater level change is caused by the water leakage within the water diversion tunnel and the slow groundwater flow velocity. Based on the streamline to indicate the groundwater flow curve, the segment method and its amendment method are adopted to calculate the discharge per unit widthand the leakage height.For the selecting sliding surface, the transfer coefficient method is used to calculate the stability of single width. At last, the stability is evaluated.
分 类 号:TV672.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117