检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北方民族大学化学与化学工程学院,银川750021 [2]北方民族大学数学与信息科学学院,银川750021 [3]四川渝建研建设工程质量检测有限责任公司,成都610041
出 处:《科学技术与工程》2015年第28期14-21,共8页Science Technology and Engineering
基 金:国家自然科学基金(51369001)资助
摘 要:宁东能源基地是国家规划的13个亿吨级大型煤炭基地之一,是国内少有的百亿吨级整装煤田,随着各矿井陆续投产,常规开采中"三下"压煤、保护煤柱及边角残煤等引起了大量的煤炭损失,这与国家可持续发展的国策不符,而穿巷开采是回收宁东煤田"三下"压煤条带煤柱可行的办法,为此需要解决好三个关键问题:首先,在综合考虑地质条件等因素后确定技术方案,同时结合理论分析与现场监测等手段,做好"采留比"的设计,主要包括确定巷道临界宽度和兼顾经济性和安全性的最小煤柱宽度;其次,要控制好掘采后巷道的充填质量,必要的时候可以在充填体中注浆,以提高充填堆积体的整体强度和空间刚度,增强充填体对顶板的支撑能力和对煤柱的约束强度,以减轻顶板大范围离层;最后,为了保证穿巷开采的顺利实施,在开采工艺上可以采取间隔式跳采法,这样大大降低了掘采过程中巷间煤柱失稳的概率,提高了永久损失煤柱回收的效率。通过实施穿巷开采,地面基本实现无矸石堆存,地表沉陷和次生地质灾害得到有效控制,地下水系和地面生态环境破坏程度大幅度降低,实现绿色开采。Ningdong energy base is one of the 13 large-scale coal bases about billion tons,and is a rare ready coal field of tens of billion tonnes of class. As coal exploration boomed,such as"three-under"pressure coal,protective coal pillar and boundary coal-pillar have caused massive coal loss subjected to conventional design. This is not in conformity with national policy for the sustainable development,however,the mining technology through excavation-mining is a feasible way to recover these coal pillars. Therefore,three key problems need to be solved:First,the relationship between the exploitation and leave behind need to be scientific decision,as considering geological conditions and other factors,meanwhile,combining with theoretical analysis and field monitoring. The main contents include the roadway critical width and minimum width of coal pillar that combination to economy and safety of; Next,the filling quality need to be guaranteed after excavation-mining,if necessary,grouting reinforcement also can be used for filling accumulation body. The aim is to improve the overall strength and space effective stiffness about the filling body,and enhance the support ability of filling body for roof and constraints strength for the coal pillar; Finally,in order to guarantee the successful implement of excavation-mining,the interval type jump mining method can be used,and it can greatly reduce the probability of coal pillar,and improve the efficiency of coal pillar recovery. If the mining technology through excavation-mining is used,the gangue will be utilized and the gangue will not exist in ground,meanwhile,the underground drainage system and the ecological environment less damage will be restrained,and finally will realize green mining.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222