城市多跨简支体系梁桥整体顶升施工过程控制技术  被引量:3

The construction process control of integrally jack-up for the urban multi-span simply supported girder bridge system

在线阅读下载全文

作  者:肖军 

机构地区:[1]成都交通投资集团有限公司,四川成都610000

出  处:《四川建筑科学研究》2015年第5期151-155,共5页Sichuan Building Science

摘  要:以成都市二环路北新立交高架桥整体顶升改造工程为例,介绍了桥梁同步顶升技术在城市立交改造工程中的应用,重点阐述了桥梁同步顶升技术的监测内容及测点布置方案,监测结果均满足要求。为多跨简支体系桥型整体顶升加固工程提供了一定的参考,同时也为相关工程改造设计及施工提供了有益经验。Taking the reconstruction project of Bei Xin interchange viaduct in the second ring road of Chengdu as an example,bridges synchronous jack-up technique in the application of the city overpass project are introduced,which focuse on the monitoring of bridge sync jack-up technique content and layout of measuring points. The monitoring results meet the requirements. The multi-span simply supported girder bridge integrally jack-up provides certain reference for engineering,as well as provides the useful experience for relevant engineering design and construction.

关 键 词:桥梁 简支梁体系 整体顶升 施工控制 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象