检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦波[1] 任静[1] 张金花[1] 段恺[1] 李华涛[1] 李江宏[1] 张晓转[1]
机构地区:[1]北京中建建筑科学研究院有限公司,北京100076
出 处:《建筑技术开发》2015年第10期45-47,共3页Building Technology Development
基 金:中建股份科技研发计划资助项目(CSCEC-2012-Z-02)
摘 要:通过对内蒙通辽某供热系统运行情况调研,结合其供热系统形式,提出改造方案,对该供热动力循环系统进行优化改造,并更换了水泵等设备,经测试分析,改造后供热动力循环系统输热耗电比均低于改造前限值要求,且节电减排效果显著。After investigation of the operation condition of a heat supply system in Tongliao City of Inner Mongolia, reconstruction scheme for this heat supply power circulation system was proposed according to the type of heat supply system. The heat supply power circulation system was optimized and water pump was replaced. It was found that the heat consumption to power transmission ratio after reconstruction was lower than the limit value of original system, and that favorable effects were realized in energy conservation and emission reduction.
分 类 号:TU832[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

