Investigation of the short-term stress distribution in stopes and drifts backfilled with cemented paste backfill  被引量:7

Investigation of the short-term stress distribution in stopes and drifts backfilled with cemented paste backfill

在线阅读下载全文

作  者:Pengyu Yang Li Li 

机构地区:[1]Department of Civil,Geological and Mining Engineering,Ecole Polytechnique de Montreal

出  处:《International Journal of Mining Science and Technology》2015年第5期721-728,共8页矿业科学技术学报(英文版)

基  金:the Natural Sciences and Engineering Research Council of Canada(NSERC);Institut de recherche Robert-Sauve en sante et en securite du travail(IRSST);industrial partners of the Research Institute on Mines and the Environment(RIME UQAT-Polytechnique)

摘  要:Cemented paste backfill(CPB) is largely used in underground mines worldwide.A key issue associated with application of CPB is to estimate the stresses in backfilled stopes and on barricades.Recent numerical and experimental results show that arching effect is absent shortly after the placement of CPB in stopes.However,stress decreases in barricade drift with increasing distance between the measurement points and drawpoint have also been observed,demonstrating arching effect shortly after the pouring of CPB.To explain these paradoxes,CPB is considered as Bingham fluid having a yield shear stress.Three dimensional analytical solutions are proposed to evaluate the short-term total stresses in backfilled stopes and on barricades,accounting for the CPB's yield shear stress-induced arching effect.Stress diminution due to such arching effect in the backfilled stopes and on barricades is indeed obtained.But the reduction becomes insignificant using typical yield shear stress and stope geometry.More analyses indicate that the typical yield shear stress values do not fully correspond to field conditions where the yield shear stress would increase exponentially due to apparent consolidation(loss of water by drainage,a phenomenon similar to the desiccation of overly saturated fine-grained materials).Cemented paste backfill(CPB) is largely used in underground mines worldwide.A key issue associated with application of CPB is to estimate the stresses in backfilled stopes and on barricades.Recent numerical and experimental results show that arching effect is absent shortly after the placement of CPB in stopes.However,stress decreases in barricade drift with increasing distance between the measurement points and drawpoint have also been observed,demonstrating arching effect shortly after the pouring of CPB.To explain these paradoxes,CPB is considered as Bingham fluid having a yield shear stress.Three dimensional analytical solutions are proposed to evaluate the short-term total stresses in backfilled stopes and on barricades,accounting for the CPB's yield shear stress-induced arching effect.Stress diminution due to such arching effect in the backfilled stopes and on barricades is indeed obtained.But the reduction becomes insignificant using typical yield shear stress and stope geometry.More analyses indicate that the typical yield shear stress values do not fully correspond to field conditions where the yield shear stress would increase exponentially due to apparent consolidation(loss of water by drainage,a phenomenon similar to the desiccation of overly saturated fine-grained materials).

关 键 词:Mines Cemented paste backfill Yield shear stress Short-term total stresses Arching effect Analytical solutions 

分 类 号:TD823.7[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象