检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘朝贤[1]
机构地区:[1]中国建筑西南设计研究院有限公司
出 处:《暖通空调》2015年第10期64-67,85,共5页Heating Ventilating & Air Conditioning
摘 要:对高层民用建筑防排烟的加压部位进行了优选,确定前室或合用前室为最佳加压部位。对机械加压送风防烟设施与自然排烟防烟设施进行了甄选,认为应淘汰自然排烟防烟设施,采用机械加压送风防烟设施。建议由最佳加压部位(即前室或合用前室)和机械加压送风防烟设施组成只向前室或合用前室加压的机械加压送风防烟系统。Determines that the antechamber or common antechamber should be taken as the best pressurization part in high rise building smoke control and extraction through optimization. Compares the mechanical pressurization smoke prevention facility and the natural smoke extraction and prevention facility, and considers that the former is better. With the best pressurization part--antechamber or common antechamber, and the mechanical pressurization smoke prevention facility, forms a mechanical pressurization smoke prevention system which only pressurizes the antechamber or common antechamber.
关 键 词:系统划分 加压部位 前室 合用前室 机械加压送风防烟设施 自然排烟防烟设施 高层建筑 防排烟
分 类 号:TU972.4[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248