上海世茂深坑酒店混凝土向下超深三级接力输送技术  被引量:3

Ultra-deep Downward Relay Delivery Concrete Technology with Three Level in Shanghai Shimao Chasm Hotel

在线阅读下载全文

作  者:葛乃剑[1] 沈玉兰 谢高华[1] 危鼎[1] 李小飞[1] 钱海波[3] 

机构地区:[1]中国建筑第八工程局有限公司,上海200122 [2]上海市松江区建设工程质量安全监督站,上海200023 [3]上海理工大学环境与建筑学院,上海200093

出  处:《施工技术》2015年第19期1-3,共3页Construction Technology

摘  要:混凝土向下超深输送,存在混凝土易离析、坍落度损失大、易堵管等问题。以上海世茂深坑酒店项目为例,主要介绍了混凝土向下超深77m三级接力输送技术。该技术主要研制了三级接力输送系统,输送系统由汽车泵、溜管、固定泵3大部分组成,通过对混凝土的配合比、工作性能的控制以及对三级输送系统操作过程的控制,解决了以上技术难题,现场实际应用效果良好。The ultra-deep concrete downward delivery has problems as easy segregation,slump big loss,easy plugging and other issues. Based on Shanghai Shimao Chasm Hotel,this paper introduced the ultradeep concrete three-relay delivery technology downward 77 meters,which developed three main relay transportation system composed of car pump,chute and fixed pump. According to the process control of concrete mixture ratio and the relay transportation,the problems were solved and good practical effect in the hotel construction was obtained.

关 键 词:混凝土 向下输送 三级接力 施工技术 

分 类 号:TU755.6[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象