检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨媛鹏 葛乃剑[1] 李小飞[1] 危鼎[1] 谢高华[1]
机构地区:[1]中国建筑第八工程局有限公司,上海200122
出 处:《施工技术》2015年第19期12-15,共4页Construction Technology
摘 要:上海世茂深坑酒店位于废弃采石坑内,如何保证边坡的稳定是本工程建设及运营的基本保证。加固时需考虑搭设附着于陡峭不规则崖壁的操作平台。由于边坡极不规则,通过BIM技术配合测量防止锚索在深部相交。通过验算、局部加固解决不规则负角度边坡的挂网喷浆。Shanghai Shimao Chasm Hotel is located in the abandoned mine pit. How to ensure the stability of the slope is the basic guarantee for the construction and operation of the project. The erection attached to the steep cliff irregular operating platform needs strengthening. Because the slope is very irregular, BIM technique was adopted combined with measurement to prevent cable in the deep intersection. Through calculation, the local reinforcement was adopted to solve the problem that hanging net and guniting with irregular negative slope angle.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.211