分层注水井合理测试周期研究  被引量:1

The Reasonable Testing Cycle of Separated Water Injectors

在线阅读下载全文

作  者:关春燕[1] 

机构地区:[1]中石油大庆油田有限责任公司第五采油厂,黑龙江大庆163513

出  处:《长江大学学报(自科版)(中旬)》2015年第10期83-86,7,共4页Journal of Yangtze University(Nature Science Edition)

摘  要:目前油田分层注水井采用的是智能化测调联动技术,研究智能化测调合理的测试周期,对于密井网条件下实现严格控制注水量、提升注水管理水平非常必要。通过研究不同类型分层注水井的测调成果,分析影响测试周期的主要因素,利用统计数据建立经验公式,通过单井层段数和水嘴直径2项参数,确定单井的动态测调周期,对于提高分层注水质量,提高注水井监测水平具有重要的指导意义。The Intelligent technology of the water injector testing and adjusting simultaneously has been used in oilfields at present.It was highly necessary to research the reasonable cycle of the injector testing and adjusting for controlling the water injection rate strictly under the dense well pattern condition and enhancing the management of the water injection.By means of analyzing the testing results of different types of layered water injectors and the main influential factors effecting the layered water injection,the empirical formula were established according to the statistical data and the dynamic testing cycle of single well was determined by applying the two factors of the well interval number and chock size.The result provides important guidance for improving the water injection quality and improving the monitoring of water injectors.

关 键 词:分层注水井 注水量 水井测调 合理周期 

分 类 号:TE357.6[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象