多振动区水电站短期调峰负荷分配方法  被引量:6

Short-time Peak Load Regulation Scheduling for Hydropower Station with Multi-vibration Zones

在线阅读下载全文

作  者:李树山[1] 李崇浩[1] 唐红兵[1] 申建建[2] 朱亮 

机构地区:[1]中国南方电网电力调度控制中心,广州510623 [2]大连理工大学,辽宁大连116024 [3]鲁布革水力发电厂,云南曲靖655800

出  处:《南方电网技术》2015年第8期77-82,共6页Southern Power System Technology

摘  要:高水头水电站机组存在与水头相关的多个不规则振动区,当参与系统调峰时,随着水头和机组组合的变化,电站要避开动态的多个振动区运行,极大地增加了调峰计划制定的难度和复杂性。针对高水头多振动区水电站调峰负荷分配问题开展研究,提出一种实用的求解方法。首先利用数学组合和集合运算理论确定组合机组振动区,然后采用耦合启发式的约束处理策略与逐次负荷分配方法进行模型求解。南方电网实际应用的算例表明,所提方法能够有效避开振动区,并能满足电站运行其它复杂约束,是一种求解高水头多振动区水电站调峰问题的可行方法。Hydropower unit with high water head has multi-vibration zones. When power stations participate in system peak load regu- lation, the hydropower station need to avoid falling into multi-vibration zones with the change of water head and unit commitment, which greatly increases the difficulty and complexity of peak load regulation planning. A practical method is proposed to solve the peak load dispatching problem for hydropower stations with multi-vibration zones in this paper. First, based on the theory of mathematical combination and set operation, the unit vibration zones are determined, then by using the coupling heuristic constraint strategy and the successive load dispatching method, the model is solved. Application results on CSG show that the proposed method can avoid the vi- bration zones effectively and meet other complex constraints of the power station operating, and method is a feasible method for the peak load regulation problem of high water head hydropower station with multi-vibration zone.

关 键 词:水电站 多振动区 调峰 

分 类 号:TM73[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象