黄龙滩水电站3号引水洞孔洞渗漏处理  被引量:1

Leakage Treatment of the No. 3 Diversion Tunnel in Huanglongtan Hydropower Station

在线阅读下载全文

作  者:王正龙 

机构地区:[1]中国电建集团中南勘测设计研究院有限公司,湖南长沙410014

出  处:《水电与新能源》2015年第10期42-45,共4页Hydropower and New Energy

摘  要:在对孔洞渗漏规模、渗漏特性进行勘查基础上,采用水泥灌浆和化学灌浆相结合的处理方案,设计了灌浆孔形式、数量和孔径;明确了灌浆材料及配比、灌浆压力等参数;阐述了化学灌浆施工过程中消防和职业健康的安全措施。通过检验孔、运行实测表明达到了预期效果,也保证了处理过程中消防和职业健康的安全。The leakage treatment measures for the No. 3 diversion tunnel in Huanglongtan Hydropower Station are introduced. Based on the investigation of leakage scale and characteristics,a treatment scheme is adopted in which the cement and chemical grouting are combined. Then,construction parameters such as the type,number and size of the grouting holes,grouting material and its mixing ratio,and the grouting pressure are determined. Safety measures for the fire control and occupational health during the chemical grouting process are also introduced. Experimental boleholes and the practical operation show that the leakage treatment is satisfactory.

关 键 词:孔洞特性 灌浆方案 灌浆孔 施工参数 安全措施 

分 类 号:U449.7[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象