复杂条件下采用人机对话方式圈定露天最终境界  

THE DELINEATION OF FINAL OPEN-PIT EDGE BY MAN-COMPUTER DIALOG UNDER COMPLICATED CONDITIONS

在线阅读下载全文

作  者:任红岗[1,2] 刘相利[1] 

机构地区:[1]北京矿冶研究总院,北京100160 [2]北京科技大学土木与环境工程学院,北京100083

出  处:《矿冶》2015年第5期9-12,共4页Mining And Metallurgy

摘  要:露天境界优化及圈定是矿山设计及生产经营工作中的核心环节,直接关系到矿山生产能力、经济效益、边坡安全、采矿设备选择等。利用3DMine软件选择Lerchs-Grossmann优化方法对某矿露天境界进行一次圈定,在此基础上,考虑露天开采的可行性,采用人机对话方式进行圈定,结果更为精确合理,为矿山建设及生产提供技术支持。Open-pit edge optimization and delineation is the core links of mining design and production man- agement. It directly related to the mine production capacity, economic benefits, slope safety , mining equipment selection, etc. The study on the open pit one-off delineation of a mine is made by means of Lerchs-Grossmann method and 3DMine. On this basis, the delineation of open-pit edge is finished by considering the feasibility of the open-pit mining. The result is more accurate and reasonable, and it provides technical support for the mine construction and production.

关 键 词:露天境界 人机对话 

分 类 号:TD216[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象