检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京中恒博瑞数字电力科技有限公司,北京100085
出 处:《电力系统保护与控制》2015年第21期136-142,共7页Power System Protection and Control
摘 要:随着220-750 kV电网线路主保护的加强,业界关于后备保护整定配合的争议越来越多。为了解决后备保护整定配合问题,介绍了高压电网线路后备保护配合整定在现场的几种常用整定方法,分析了不同整定配合方案考虑的原因。针对接地距离测量阻抗受零序补偿系数的影响,分析了接地距离保护整定中需要特殊考虑的问题。通过对高压电网线路后备保护作用分析以及实际案例验证,推荐了一种高压系统后备保护的整定计算方法。As the primary protection of the 220-750 kV network strengthens, there are more controversy to relay coordination of backup protection in power industry. To solve the problem, this paper mainly introduces several common installation methods used in the field about backup relay coordination in high voltage power network, and analyzes the reasons of different relay coordination schemes. In view of grounding distance measuring impedance under the influence of zero sequence compensating coefficient, the special consideration in grounding distance protection setting is discussed. Furthermore, through the analysis of high voltage power network backup protection and verification of actual case, a setting calculation method used in high voltage system backup protection is recommended.
分 类 号:TM773[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15