检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黑龙江省三江工程建设管理局,黑龙江哈尔滨150081 [2]黄河勘测规划设计有限公司,河南郑州450003
出 处:《人民黄河》2015年第11期40-42,共3页Yellow River
摘 要:国家建设集体土地征收一般实行"又征又转"的征地政策,黄河下游"十三五"防洪工程淤区征地将采用"只征不转"模式。通过对"又征又转"和"只征不转"两种征地模式进行对比分析,认为黄河下游防洪工程采用"只征不转"征地模式是征地制度的改革和创新。The policy of “land acquisition changing the original land use” is generally implemented during collective land acquisition for national construction projects, while“land acquisition keeping the original land use” is implemented for short-term flood control works and the upcoming flood control works of the 13th National Five-Year Plan in the Lower Yellow River. Based on comparison of the aforementioned two ways of land acquisition, this paper presented that“land acquisition keeping the original land use”for flood control works in the Lower Yellow River is a reform and innovation.
关 键 词:征地方式 又征又转 只征不转 防洪工程 黄河下游
分 类 号:TV871[水利工程—水利水电工程] TV882.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145