检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]杭州科技职业技术学院,杭州311402 [2]湖州职业技术学院,浙江湖州313000 [3]江西省赣建工程建设监理有限公司湖州公司,浙江湖州313000 [4]浙江省地球物理地球化学勘查院,杭州310020
出 处:《工业建筑》2015年第10期191-195,47,共6页Industrial Construction
摘 要:预应力管桩在软土地层施工由于施工速度快、施工效率高,应用较为广泛,但软土层具有含水量高、强度低、稳定性差等特点,预应力管桩施工会出现管桩上浮、偏位、损伤、断裂等质量事故。带地下室的高层建筑由于需要进行基坑土方开挖,挖土机械扰动土层、碰撞管桩,更易造成质量事故的发生。针对典型软土地区湖州地区管桩施工出现的质量事故,进行事故原因分析并介绍了事故处理方法。经加固处理后,检测及沉降观测显示:处理后的管桩均符合设计要求,并且建筑物沉降较小、沉降均匀,均符合设计要求。Prestressed pipe pile is widely used in soft soil area due to its fast construction speed and high efficiency. However, the pipe piles are prone to floating, deviation, damage and fracture due to high water content, weak strength, poor stability for soft soil.As foundation excavation is needed for high-rise building with basement, construction accidents are more likely to occur when foundation soils are disturbed or piles are crashed.In light of project cases in typical soft soil of Huzhou Region, the paper showed conventional construction process of the pipe piles for high-rise building with basement and common pipe pile quality construction accidents, also analyzed the causes of the accident, and introduced treatment methods for the accident.Later detection and settlement observation indicated that the treated pile could meet the design requirements, and the building settlement was minor and even.
关 键 词:预应力管桩 软土地区 地下室 质量事故 处理方案
分 类 号:TU753.3[建筑科学—建筑技术科学] TU712.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.58.73.22