广东省某水库工程防汛抢险应急措施后评价  

Post Evaluation for Flood Protection and Disaster- Relief to A Reservoir

在线阅读下载全文

作  者:彭艳[1] 李海燕 黄健东[1] 魏俊彪[1] 

机构地区:[1]广东省水利水电科学研究院广东省水动力学应用研究重点实验室,广东广州510635 [2]河南中原黄河工程有限公司,河南新乡453003

出  处:《广东水利水电》2015年第7期12-15,共4页Guangdong Water Resources and Hydropower

摘  要:通过资料收集、现场勘察以及反演计算,对广东省某水库工程防汛抢险进行分析与后评价。结果表明:即使不开底孔,库水位也不会超过设计水位,但是在未来天气不确定、预报入库洪水偏大的情况下,打开底孔泻洪,将风险控制在了最低。此外,研究还表明延长入库洪水预见期、提高洪水预报精度,对今后水库防汛抢险工作具有重要意义。Based on field survey and computation analysis,a post evaluation of the disaster- relief in a reservoir flood protection has been carried out. It is concluded that the risk has been controlled in the lowest by opening the bottom hole in the case of an uncertain weather and a higher flood forecasting. The research also shows that a longer flood lead- time and higher accuracy in flood forecasting plays an important role in flood control.

关 键 词:防汛抢险 后评价 入库洪水预报 某水库 

分 类 号:TV871.3[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象