检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张铁[1]
出 处:《中国水能及电气化》2015年第10期49-52,共4页China Water Power & Electrification
摘 要:水库输水隧洞主要承担工程导流、水流消能等任务,是水库工程中的重要组成部分。本文以辽宁观音阁水库工程为实例,结合具体工程地质条件,介绍了输水隧洞的断面设计、衬砌支护设计参数以及施工方案,并对工程中细节施工问题作了列举分析,以期为以后该类工程建设提供一些可参考经验。Reservoir water conveyance tunnel mainly undertakes the tasks of project diversion,water flow energy dissipation,etc.It is an important part in reservoir engineering.In the paper,Liaoning Guanyinge Reservoir Project is adopted as an example.Concrete engineering geological conditions are combined for introducing the section design of water conveyance tunnel,lining supporting design parameters and construction plan.Detailed construction issues in the project are analyzed by examples,thereby providing some reference experience for construction in similar projects in the future.
分 类 号:TV672.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30