吴集铁矿-200m中段矿柱安全回采试验  被引量:2

Safety Stoping Test of the Pillar of- 200 m Section in Wuji Iron Mine

在线阅读下载全文

作  者:刘庆喜[1] 朱国涛[1] 曹勇[1] 

机构地区:[1]五矿邯邢矿业安徽开发矿业有限公司

出  处:《现代矿业》2015年第10期18-20,26,共4页Modern Mining

基  金:"十二五"国家科技支撑计划项目(编号:2013BAB02B04)

摘  要:吴集铁矿-200 m中段以上一步骤采场基本回采完毕,正在进行充填,为了保证生产稳产衔接和积累二步骤矿柱回采经验,急需开展-200 m中段矿柱回采试验。结合赋存条件、矿柱特征,采用分段凿岩阶段空场嗣后充填法,顺利实现安全高效回采,为其他中段矿柱回采提供技术参考。The first step stope above the -200 m section in Wuji iron was finished basically,the filling work is conducted now.In order to ensure the production stable and accumulate the stoping experi-ence of the second step pillar,it is necessary to conduct the stoping test of -200 m section pillar.Com-bing with the occurrence conditions and pillar characteristics,the sublevel drilling open stoping in stage with subsequent filling method is adopted,therefore,the object of safety mining with high efficiency is re-alized,it can provide technical reference for stoping the other section pillars.

关 键 词:矿柱回采 分段凿岩阶段空场嗣后充填法 充填体强度 

分 类 号:TD861.1[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象