检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]五矿邯邢矿业安徽开发矿业有限公司
出 处:《现代矿业》2015年第10期18-20,26,共4页Modern Mining
基 金:"十二五"国家科技支撑计划项目(编号:2013BAB02B04)
摘 要:吴集铁矿-200 m中段以上一步骤采场基本回采完毕,正在进行充填,为了保证生产稳产衔接和积累二步骤矿柱回采经验,急需开展-200 m中段矿柱回采试验。结合赋存条件、矿柱特征,采用分段凿岩阶段空场嗣后充填法,顺利实现安全高效回采,为其他中段矿柱回采提供技术参考。The first step stope above the -200 m section in Wuji iron was finished basically,the filling work is conducted now.In order to ensure the production stable and accumulate the stoping experi-ence of the second step pillar,it is necessary to conduct the stoping test of -200 m section pillar.Com-bing with the occurrence conditions and pillar characteristics,the sublevel drilling open stoping in stage with subsequent filling method is adopted,therefore,the object of safety mining with high efficiency is re-alized,it can provide technical reference for stoping the other section pillars.
关 键 词:矿柱回采 分段凿岩阶段空场嗣后充填法 充填体强度
分 类 号:TD861.1[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.142.123